Special Projects

Center Circle Drainage Expansion

$6,756

The roundabout of The Amazima Secondary School is a focal point of our campus. The students walk past it everyday to get to the kitchen, and they enjoy studying under the shade of the fig tree planted in the center. Due to the construction on campus and heavy rains, our drainage system within the roundabout needs updating. This will allow us to redirect the water away from the roadway and keep the center green space free from flooding.

Donate this Special Project
Scroll to Top
Send this to a friend